翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Verzasca Dam : ウィキペディア英語版
Contra Dam

The Contra Dam, commonly known as the Verzasca Dam and the Locarno Dam, is an arch dam on the Verzasca River in the ''Val Verzasca'' of Ticino, Switzerland. The dam creates Lago di Vogorno upstream of Lake Maggiore and supports the 105 MW Verzasca Hydroelectric Power Station hydroelectric power station. It was constructed between 1961 and 1965 and starting shortly after its reservoir was filled, a series of earthquakes related to its water load occurred until 1971. The dam is owned and operated by Verzasca SA and is the fourth tallest in Switzerland.
The dam became a popular bungee jumping venue after a James Bond stuntman jumped off it in the opening scene of the 1995 film ''GoldenEye''; a stunt voted as the best movie stunt of all time in a 2002 ''Sky Movies'' poll.
==Background==
On May 6, 1960, Verzasca SA was formed to construct the dam as the center-piece of the Verzasca Hydroelectric Complex. Construction in the dam began in 1961. The dam was designed and its construction supervised by Lombardi & Gellaro Ltd. Because the Contra Dam is at a lower elevation compared to other Swiss dams, warmer weather allowed construction to be carried out year-round. To divert the river and prepare a dry work-site for the dam, cofferdams were constructed, one of which redirected the river through a diversion tunnel with a capacity. As the river can have flows much higher than the tunnel's capacity, this was accepted as a risk by engineers. Excavation of the right side of the dam had to be expanded due to unforeseen weathered rock and designs were altered within 15 days.〔
Concrete pouring and placement occurred for 18 months, of which the maximum poured in a day was and in a month, . The aggregate for the concrete was obtained from a quarry near the construction site. The high-quality and strength gneiss-rock was ground in a rotary crusher and prepared in the concrete mixture. To facilitate the contraction and settling of the concrete in the dam, it was cooled with a series of steel pipes that ran throughout the mass of concrete, with the exception of the top of the dam. A grout curtain was placed around and below the dam as well to prevent leakage, which consumed a large amount of cement. In August 1964, the reservoir began to fill and in September 1965, the reservoir was full and the dam completed.〔